2015 South Wastewater Treatment Facility – Fox Metro Water Reclamation District

Project consisted of the construction of a headworks building, a primary sludge pump
station, primary clarifiers, BNR tanks, a secondary control building, final clarifiers, and
ferric chloride storage. Also included was all architectural, civil, process, mechanical,
electrical, instrumentation and control works for a complete and functional wastewater treatment facility.

View More in Waste Water/Water Treatment

Mississippi River Wastewater Treatment Plant Upgrades

General construction of wastewater treatment facility buildings and concrete basins including fine screen equipment, grit removal equipment, rotary lobe and centrifugal blowers, fine pore aeration equipment, secondary clarifier equipment, ultraviolet disinfection equipment, gravity belt thickeners, chemical storage tanks and feed…

City Water Light Power – Water Works Improvements Projects, Contract 2 – Clearwell No. 3

Construction of a cast-in-place reinforced concrete clearwell, associated excavation, final grading, seeding and fertilizing, erosion control, surface and subsurface drainage, buried storm sewer and drainage piping, boring and jacking of pipe casing, protection of and shoring for adjacent utilities, manhole…