Anna-Jonesboro Water Commission Water Treatment Plant Renovation

Project consisted of demolition of the existing head tank, aerator building, clarifier, recarbonation tank and lime silo; removal of the existing generator; an addition to Filter Building 1; rehabilitation of existing filters and filter piping including replacing of filter valves and installation of a backwash pump; rehabilitation of high service pump station piping; construction of a new aerated head tank; helical flow clarifier and high density lime system; piping modifications; construction of fabricated steel bridges, stairs and landings; PCC sidewalk removal and replacement; repainting of the control building exterior; removal and replacement of flow and level measurement equipment; rehabilitation of the existing concrete clearwell; electrical work; site work and other miscellaneous items of work.

View More in

University of Missouri – Life Sciences Center

The facility consists of a 235,000 square foot teaching and research laboratory building with an adjacent service building, connecting underground service corridor and associated site development.  The main building contains research laboratories and support facilities, offices, conference rooms and a 250…

SAFB MACC Repair HVAC/Construct building 3677

Bid Date: 9/9/2011
Bid Time: 12:00 PM
Location: SAFB, IL
Estimator: KK

Below are PDF versions of the project drawings: