Anna-Jonesboro Water Commission Water Treatment Plant Renovation

Project consisted of demolition of the existing head tank, aerator building, clarifier, recarbonation tank and lime silo; removal of the existing generator; an addition to Filter Building 1; rehabilitation of existing filters and filter piping including replacing of filter valves and installation of a backwash pump; rehabilitation of high service pump station piping; construction of a new aerated head tank; helical flow clarifier and high density lime system; piping modifications; construction of fabricated steel bridges, stairs and landings; PCC sidewalk removal and replacement; repainting of the control building exterior; removal and replacement of flow and level measurement equipment; rehabilitation of the existing concrete clearwell; electrical work; site work and other miscellaneous items of work.

View More in

Truman State University – Kirk Memorial Renovations

Complete exterior renovation of Kirk Memorial, which include repair of stone cornice work, installation of new Pella windows and doors, plaster patching of the rotunda, repair of the tile roof of the rotunda, and a new cupola.  

AGC Project of the Year

River City Construction is awarded Project of the Year by a General Contractor ($10 to $25 million) for the Clinical Support and Education Building, University of Missouri.