Anna-Jonesboro Water Commission Water Treatment Plant Renovation

Project consists of demolition of the existing head tank, aerator building, clarifier, recarbonation tank and lime silo; removal of the existing generator; an addition to Filter Building 1; rehabilitation of existing filters and filter piping including replacing of filter valves and installation of a backwash pump; rehabilitation of high service pump station piping; construction of a new aerated head tank; helical flow clarifier and high density lime system; piping modifications; construction of fabricated steel bridges, stairs and landings; PCC sidewalk removal and replacement; repainting of the control building exterior; removal and replacement of flow and level measurement equipment; rehabilitation of the existing concrete clearwell; electrical work; site work and other miscellaneous items of work.

View More in Current Projects

St. Philomena Church – New Parish Center

The new Parish Center is “truly a family center” that will serve every parishioner with a large banquet room for wedding receptions and funeral luncheons, a catering kitchen, parish offices, meeting rooms, and a multi-functional basement for athletic activities, children’s…

Caterpillar Inc.

On-going contracts for in-plant and corporate office renovations and upgrades including equipment installations and relocations.