Anna-Jonesboro Water Commission Water Treatment Plant Renovation

Project consisted of demolition of the existing head tank, aerator building, clarifier, recarbonation tank and lime silo; removal of the existing generator; an addition to Filter Building 1; rehabilitation of existing filters and filter piping including replacing of filter valves and installation of a backwash pump; rehabilitation of high service pump station piping; construction of a new aerated head tank; helical flow clarifier and high density lime system; piping modifications; construction of fabricated steel bridges, stairs and landings; PCC sidewalk removal and replacement; repainting of the control building exterior; removal and replacement of flow and level measurement equipment; rehabilitation of the existing concrete clearwell; electrical work; site work and other miscellaneous items of work.

View More in

Illinois State University – Student Fitness & Kinesiology/Recreation Building

Extensive cost reduction/value engineering, innovative solutions for construction recycling – This project consisted of the demolition of two existing residence halls along with the selective demolition…

Normal Multimodal Transportation Center Dedication

Town of Normal Uptown Station Dedication.