Anna-Jonesboro Water Commission Water Treatment Plant Renovation

Project consists of demolition of the existing head tank, aerator building, clarifier, recarbonation tank and lime silo; removal of the existing generator; an addition to Filter Building 1; rehabilitation of existing filters and filter piping including replacing of filter valves and installation of a backwash pump; rehabilitation of high service pump station piping; construction of a new aerated head tank; helical flow clarifier and high density lime system; piping modifications; construction of fabricated steel bridges, stairs and landings; PCC sidewalk removal and replacement; repainting of the control building exterior; removal and replacement of flow and level measurement equipment; rehabilitation of the existing concrete clearwell; electrical work; site work and other miscellaneous items of work.

View More in Current Projects

Elmwood Community School District #322 Addition and Renovations

The project includes the addition and renovation of many school functions to improve programs for the current and near term future needs as well as addressing parking, vehicular traffic, security, interior circulation, student life, HVAC concerns, and the appearance of…

Kirksville Wastewater Treatment Plant Improvements

Improvements to the current Wastewater Treatment Plant include increasing the plant’s over all average daily flow capacity to 4.0 million gallons per day with the ability to handle peak flows of 12.0 million gallons per day, a new influent pump…