Slide 1
Slide 1
Slide 2
Slide 2
Slide 3
Slide 3
Slide 4
Slide 4
Slide 5
Slide 5
Slide 6
Slide 6
Slide 7
Slide 7
Slide 9
Slide 9
Slide 10
Slide 10
Slide 11
Slide 11
Slide 12
Slide 12
Slide 13
Slide 13
Slide 14
Slide 14
Slide 15
Slide 15
Slide 16
Slide 16

Harry S. Truman Veterans Memorial Hospital – Surgical Suite Addition / Renovation

Addition and renovation to the Harry S. Truman Veterans Memorial Hospital. This multi-phased project included a new addition that houses an operating room suite with five operating rooms, two of which will be general purpose, two dedicated to heart surgery and one dedicated to special procedures.  The old operating rooms were renovated and a new post anesthesia care unit and pre-operation room were added. Additional renovations included new patient room layouts, MEP upgrades, and renovated space for support functions that include PACU, pre-operatory prep and holding rooms, and staff lockers.

 

View More in Health Care

New Fulton State Hospital Guhleman and Hearnes Boiler Plant

Project consisted of the abatement and demolition of existing buildings, tunnels, site utilities, roads and other site improvements at Fulton State Hospital. Construction included the rerouting of existing and installation of new site utilities; constructing a pre-engineered metal building on…

Columbia Regional Hospital – Fourth Floor Renovation

This project consisted of a complete renovation of the fourth floor of the Columbia Regional Hospital (23,484 square feet) including a mechanical penthouse addition for the new HVAC unit to serve the fourth floor.  The new forth floor houses Orthopedics and has several…