Indiana American Water, Middle Fork Water Treatment Plant Improvements

Project includes the design, permitting, and construction of all Improvements including clarification, filtration, UV disinfection, chemical storage and feed facilities, clear water storage, residual handling, and associated facilities. The project scope of work also includes raw water pumping station, raw water transmission main, and distribution pumping station at the Main Station Water Treatment Plant (MSWTP). The retirement and demolition of existing facilities at MFWTP and MSWTP shall also be included in the project scope of work.

View More in Current Projects

2015 South Wastewater Treatment Facility – Fox Metro Water Reclamation District

Project consists of the construction of a headworks building, a primary sludge pump station, primary clarifiers, BNR tanks, a secondary control building, final clarifiers, and ferric chloride storage. Also included is all architectural, civil, process, mechanical, electrical, instrumentation and control…

Fulton State Hospital – New Hospital

Scope includes constructing a new 300-bed, high-security, psychiatric hospital. The scope includes the abatement and demolition of existing buildings. The hospital is a steel framed building. Walls include masonry bearing walls with ultra-high performance concrete panels. Project includes security systems…