KAWC – Jacobson Reservoir, Richmond Road Station and Kentucky River Station 1- Chemical Improvements

Richmond Road Station and Kentucky River Station 1 Chemical Improvements includes replacement of the existing chemical storage and feed facilities and equipment, including: sodium permanganate relocation from Jacobson Reservoir to Richmond Road Station, polyaluminum chloride, polymer, fluoride, and phosphate at Richmond Road Station, powdered activated carbon relocation from Richmond Road Station to Jacobson Reservoir and ferric chloride and sodium permanganate at Kentucky River Station 1.  Additionally, the project will include the conversion of several chemicals applied at both Richmond Road Station and Kentucky River Station 1, including: gaseous chlorine to sodium hypochlorite, gaseous ammonia to ammonium hydroxide (aqua ammonia) and caustic to liquid lime.

View More in Current Projects

KAWC – Jacobson Reservoir, Richmond Road Station and Kentucky River Station 1- Chemical Improvements

Richmond Road Station and Kentucky River Station 1 Chemical Improvements includes replacement of the existing chemical storage and feed facilities and equipment, including: sodium permanganate relocation from Jacobson Reservoir to Richmond Road Station, polyaluminum chloride, polymer, fluoride, and phosphate at…

Indiana American Water, Middle Fork Water Treatment Plant Improvements

Project includes the design, permitting, and construction of all Improvements including clarification, filtration, UV disinfection, chemical storage and feed facilities, clear water storage, residual handling, and associated facilities. The project scope of work also includes raw water pumping station, raw…