Champaign-Urbana Mass Transit District Expansion / Renovation

The project consisted of a new 68,000 square foot pre-engineered metal building addition to the existing 803 E. University building. The addition included 20,600 square feet of mezzanine space for storage, training rooms and office space. Site improvements included concrete…

Charleston Water Treatment Plant Improvements

This project consists of constructing a new lagoon effluent pump station and forcemain; construct and install temporary environmental controls and temporary utilities; construct a new water treatment plant and new raw water pump station while keeping the existing raw water…

City of Benton Wastewater Treatment Facility

Project consisted of new barscreen and grit structure, terminal lift station, new oxidation ditch, two (2) 95’-0” diameter clarifier tanks, new digester tanks, RAS/WAS pump station, parshall flume structure, UV disinfection structure, cascade aerator, new MCC building, sludge pump station,…

City of Mexico Wastewater Treatment Plant Improvements Phase II

Project consisted of the removal of existing influent pumps with selective demolition, furnishing and installation of new submersible influent pumps, a new influent pump station control building, cleaning and modifications with selective demolition of two existing anaerobic digesters including a…

City of Murphysboro Wastewater Treatment Plant

Project consisted of new barscreen and grit structure, grease separator, two (2) 120’-0” diameter aeration tanks, two (2) 76’-0” diameter clarifier tanks, two (2) 58’-0” digester tanks, new aeration and digester blower structures, RAS/WAS pump station, splitter boxes, parshall flume…