Construction of a new 15 MGD water treatment plant which included a Raw Water Pump Station, 4 clarifiers, 6 filters, treatment facilities, chemical facilities, administrative facilities, and a clearwell/pump station building.
Project included the construction of one (1) 80-foot diameter final clarifier, primary clarifier, nitrification basin, ultraviolet disinfection system, various equipment replacements, and modifications to existing plant structures.
Replaced influent pumping, low measurement, existing blowers, and existing mechanically cleaned bar screen. Constructed a new bar screen building, 6.0-MGD oxidation ditch, two 100 foot diameter secondary clarifiers, return/waste activated sludge pump station, digested sludge pump station, and plant water…
Project included the construction of two 85′ diameter final clarifiers, oxidation ditch, biosolids control building, biosolids storage building, screening building, equipment storage building and modifications to existing plant structures.
This project consists of constructing a new lagoon effluent pump station and forcemain; construct and install temporary environmental controls and temporary utilities; construct a new water treatment plant and new raw water pump station while keeping the existing raw water…