Our construction know-how combined with our commitment to partnering with clients, employees, and the community make River City Construction an industry leader.

Waste Water/Water Treatment

Carpentersville Wastewater Treatment Plant Modifications

Project included the construction of two 85′ diameter final clarifiers, oxidation ditch, biosolids control building, biosolids storage building, screening building, equipment storage building and modifications to existing plant structures.

Charleston Water Treatment Plant Improvements

This project consists of constructing a new lagoon effluent pump station and forcemain; construct and install temporary environmental controls and temporary utilities; construct a new water treatment plant and new raw water pump station while keeping the existing raw water…

City of Benton Wastewater Treatment Facility

Project consisted of new barscreen and grit structure, terminal lift station, new oxidation ditch, two (2) 95’-0” diameter clarifier tanks, new digester tanks, RAS/WAS pump station, parshall flume structure, UV disinfection structure, cascade aerator, new MCC building, sludge pump station,…

City of Mexico Wastewater Treatment Plant Improvements Phase II

Project consisted of the removal of existing influent pumps with selective demolition, furnishing and installation of new submersible influent pumps, a new influent pump station control building, cleaning and modifications with selective demolition of two existing anaerobic digesters including a…

City of Murphysboro Wastewater Treatment Plant

Project consisted of new barscreen and grit structure, grease separator, two (2) 120’-0” diameter aeration tanks, two (2) 76’-0” diameter clarifier tanks, two (2) 58’-0” digester tanks, new aeration and digester blower structures, RAS/WAS pump station, splitter boxes, parshall flume…