Our construction know-how combined with our commitment to partnering with clients, employees, and the community make River City Construction an industry leader.

Waste Water/Water Treatment

DeKalb Sanitary District – 2007 Lions Park Lift Station Improvements

Construction and installation of a new lift station including wet wells, valve room, piping, valves, generator, HVAC, fire alarm and control systems.  Remove existing lift station facilities, manholes, underground piping, all related utilities, and adjacent basketball court.  Site restoration and maintenance are…

Dixon Wastewater Treatment Plant

Project included the construction of two 100′ diameter final clarifiers, preliminary treatment building, two oxidation ditches, ultraviolet disinfection system, biosolids control building, administration building, and demolition of selected existing structures.

Duckett Creek Sanitary District Treatment Plant 1 and 2 Improvements

Project consisted of general site preparation, general grading and the construction of improvements at Treatment Plant 1 (TP1) and Treatment Plant 2 (TP2).  TPI included installation of new screening equipment, headworks HVAC upgrades, and update plant control system.  TP2 included…

East Dundee Wastewater Treatment Facility Expansion – Phase II

This project consisted of the construction of a new 1.5 million gallon oxidation ditch, (2) new 65’ diameter final clarifiers with dome covers, membrane thickener, mixing basin with aluminum covers, and new 4-bay vehicle storage building. Additionally, modifications were made to…

Fox Metro Water Reclamation District – Contract 1

Project consisted of a new excess flow pump station, including raw sewage pumps and associated structural, architectural, mechanical electrical and instrumentation and control work; a new chlorine contact tank, including sludge removal equipment and chlorine sampling equipment, and associated structural,…