This project consisted of constructing a new 224,000 square foot Pre-K – 12 school consisting of 90+ classrooms with internet capability and integrated communications data.
Project consisted of a new excess flow pump station, including raw sewage pumps and associated structural, architectural, mechanical electrical and instrumentation and control work; a new chlorine contact tank, including sludge removal equipment and chlorine sampling equipment, and associated structural,…
Construction of a 1-story, masonry wall, slab on grade building with approximately 22,000 square feet of space. Facility includes dormitory, classroom, office and support areas for Probation and Parole functions for the State of Missouri in the Fulton area.
This project was an expansion of the existing wastewater treatment plant and consisted of the construction of a new tertiary filter building, electrical building, cascade aerator/flume structure, and pump station. Also included was the installation of associated process piping, new electrical service, slide…
Division 21 Addition of two process air blowers; provision of blower electrical gear; replacement of existing aeration tank equipment. Division 22 Construction of a new thickening building including four gravity belt thickeners with all associated plumbing. Division 23 Construction of a new Dewatering Building including…