Slide 1
Slide 1
Slide 2
Slide 2
Slide 3
Slide 3
Slide 4
Slide 4
Slide 5
Slide 5
Slide 6
Slide 6
Slide 7
Slide 7

Sedalia School District #200 New High School

This project consisted of the construction of a new high school facility for the Sedalia School District #200.  The 202,300 square foot, 2 story building contains two gymnasiums, a cafeteria, classrooms, offices, a library, performing arts center, choir and band rooms.  The building also contains 10,000 square feet of space for future use.  The steel and block structure is enclosed by pre-cast panels, glass curtain walls, along with block, brick and limestone.  Specialty finishes include wood gymnasium flooring, stained concrete, rubber flooring and synthetic flooring.

  • Owner: Sedalia School District #200
  • Architect: Sam Winn Architects
  • Status: Completed July 2009

View More in Schools

Jersey C.U.S.D. #100 New Grafton Elementary School

New elementary school encompassing 90,000 square feet.  Facility includes classroom space, science and computer labs, a library, gymnasiums, and administrative offices.  Site development of 20 acres includes site parking and athletic fields.

Peoria Notre Dame – Outdoor Athletic Complex Phase I

The project scope includes all work associated with site grading and infrastructure for the future development of two (2) baseball fields, two (2) softball fields, natural turf practice fields for football and soccer, artificial turf football/soccer field with an 8…