University of Missouri Teaching Hospital – West Wing – Expansion/Renovation

The overall project consists of (4) separate projects. The first project consists of renovating several floors of the existing Hospital along with site reconstruction at the emergency room entrance and parking lots. The second project consists of replacing the existing Hospital generators with new fuel powered generators and various architectural renovations to the area surrounding the new generators. The third project consists of removing and replacing steam tunnel lids and steam piping along with structural repairs to the existing steam tunnel walls. The fourth project consists of structural repairs and vent pipe replacement of an existing steam tunnel manhole at the emergency ambulance drive.

View More in Current Projects

Franklin County Sheriff’s Office and Jail Addition and Renovation

Project consists of: • New Detention Addition • New 911 Dispatch Addition • Multi-Phased Renovation of Existing Sheriff’s Department

Nazareth House – Catholic Diocese of Peoria

The Nazareth House project is a new 66,500 square foot retreat center that includes a main chapel area, four-story 70-room guest wing, conference/convention space, commercial kitchen, and dining facility. Site improvements consist of construction of a new pond, walking trails, access road improvements,…