University of Missouri Teaching Hospital – West Wing – Expansion/Renovation

The overall project consists of (4) separate projects. The first project consists of renovating several floors of the existing Hospital along with site reconstruction at the emergency room entrance and parking lots. The second project consists of replacing the existing Hospital generators with new fuel powered generators and various architectural renovations to the area surrounding the new generators. The third project consists of removing and replacing steam tunnel lids and steam piping along with structural repairs to the existing steam tunnel walls. The fourth project consists of structural repairs and vent pipe replacement of an existing steam tunnel manhole at the emergency ambulance drive.

View More in Current Projects

KAWC – Jacobson Reservoir, Richmond Road Station and Kentucky River Station 1- Chemical Improvements

Richmond Road Station and Kentucky River Station 1 Chemical Improvements includes replacement of the existing chemical storage and feed facilities and equipment, including: sodium permanganate relocation from Jacobson Reservoir to Richmond Road Station, polyaluminum chloride, polymer, fluoride, and phosphate at…

South Beloit Wastewater Treatment Plant Improvements

The South Beloit WWTP project is a $34 million dollar, multi-phase project. It entails the demolition of numerous structures along with modifications to existing structures to create the new plant. Construction will include a new headworks building, control building, clarifiers,…