University of Missouri Teaching Hospital – West Wing – Expansion/Renovation

The overall project consists of (4) separate projects. The first project consists of renovating several floors of the existing Hospital along with site reconstruction at the emergency room entrance and parking lots. The second project consists of replacing the existing Hospital generators with new fuel powered generators and various architectural renovations to the area surrounding the new generators. The third project consists of removing and replacing steam tunnel lids and steam piping along with structural repairs to the existing steam tunnel walls. The fourth project consists of structural repairs and vent pipe replacement of an existing steam tunnel manhole at the emergency ambulance drive.

View More in Current Projects

Unity Point Health Methodist – Revisions Partnering Package

ASHE CERTIFIED PERSONNEL. On-going projects include bringing the existing buildings up to Illinois Department of Public Health and local codes, overseeing the retrofitting and installation of new mechanical/electrical systems throughout, and the remodeling of office spaces, diagnostic areas and patient…

4500 Prospect Development

New construction of a 3-story, 17,741 square foot multi-tenant commercial office & retail building in downtown Peoria Heights, IL. Project is located at the NE corner of Kelly and Prospect Avenues, and will adjoin to the existing brick building to…