University of Missouri Teaching Hospital – West Wing – Expansion/Renovation

The overall project consists of (4) separate projects. The first project consists of renovating several floors of the existing Hospital along with site reconstruction at the emergency room entrance and parking lots. The second project consists of replacing the existing Hospital generators with new fuel powered generators and various architectural renovations to the area surrounding the new generators. The third project consists of removing and replacing steam tunnel lids and steam piping along with structural repairs to the existing steam tunnel walls. The fourth project consists of structural repairs and vent pipe replacement of an existing steam tunnel manhole at the emergency ambulance drive.

View More in Current Projects

Oak Grove School District #68 – West Expansion and Renovation

This project combines the collaborative efforts of both River City Construction and River City Design Group to provide comprehensive Construction Management @ Risk and Architectural Design for seamless professional services.  The project planning created a design and budget to provide…

Kirksville Wastewater Treatment Plant Improvements

Improvements to the current Wastewater Treatment Plant include increasing the plant’s over all average daily flow capacity to 4.0 million gallons per day with the ability to handle peak flows of 12.0 million gallons per day, a new influent pump…