University of Missouri Teaching Hospital – West Wing – Expansion/Renovation

The overall project consists of (4) separate projects. The first project consists of renovating several floors of the existing Hospital along with site reconstruction at the emergency room entrance and parking lots. The second project consists of replacing the existing Hospital generators with new fuel powered generators and various architectural renovations to the area surrounding the new generators. The third project consists of removing and replacing steam tunnel lids and steam piping along with structural repairs to the existing steam tunnel walls. The fourth project consists of structural repairs and vent pipe replacement of an existing steam tunnel manhole at the emergency ambulance drive.

View More in Current Projects

Fulton State Hospital – New Hospital

Scope includes constructing a new 300-bed, high-security, psychiatric hospital. The scope includes the abatement and demolition of existing buildings. The hospital is a steel framed building. Walls include masonry bearing walls with ultra-high performance concrete panels. Project includes security systems…

The State Historic Society of Missouri Center for Missouri Studies

Project consists of a new 3-story facility for the new State Historical Society Building to include gallery space, lecture halls, archives, library, classroom, offices, and conference rooms, as well as corridor and vertical circulation, mechanical and electrical equipment space, and…