The project consisted of the construction and installation of a new water treatment facility, including reverse osmosis treatment systems, ground storage tanks, clearwells, chemical feed systems, aeration equipment, odor control systems, intermediate booster pumps, and a high-service pump station. Work also included construction of a treatment plant building and storage building, installation of raw water mains and associated site piping, and improvements to remote well facilities, including well pumps and well buildings. Additional improvements included installation of a standby generator, electrical and control systems, SCADA system, security fencing and facilities, and associated site electrical infrastructure. Site development consisted of grading, paving, seeding, erosion control measures, and stormwater detention facilities, along with all related appurtenances and miscellaneous work necessary to complete the project.