2024 WWTP Improvements, City of Canton

Galesburg, IL

Project Summary

The project encompasses a comprehensive scope of work aimed at upgrading and expanding wastewater treatment infrastructure. It includes the demolition of existing tanks, buildings, drying beds, piping, equipment, electrical facilities, and other associated components. New construction efforts involve a headworks facility, two oxidation ditch treatment systems, two secondary clarifiers, drying bed facilities, aerobic digesters, and a sludge processing facility. Additional improvements feature the development of various pump stations, a chemical feed facility, a garage, an office/laboratory building, and new piping systems throughout the plant. The project also includes the installation of a standby generator and updated electrical systems, along with various other supporting facilities to ensure operational efficiency and long-term reliability.

Project Details

  • Type: Improvements
  • Delivery Method: Design-Bid-Build