Back to
Top

Mississippi River Wastewater Treatment Plant Upgrades

St. Charles, MO

Mississippi River

Project Summary

Project included general construction of wastewater treatment facility buildings and concrete basins including fine screen equipment, grit removal equipment, rotary lobe and centrifugal blowers, fine pore aeration equipment, secondary clarifier equipment, ultraviolet disinfection equipment, gravity belt thickeners, chemical storage tanks and feed systems, wastewater and sludge pumps, site work, yard piping, structural, architectural, process piping and equipment, plumbing, heating, ventilation, air conditioning, electrical and instrumentation and control.

Project Details

  • Type: Addition and Renovation
  • Delivery Method: General Contractor