Tunnel Repairs Phase III, Southeast Missouri State University

Cape Girardeau, MO

Project Summary

The project entailed demolishing and removing approximately 500 linear feet of concrete tunnel lid to remove the existing mechanical piping and electrical and install new piping and electrical. The replacement tunnel lid was reinstalled with poured-in-place concrete.

Project Details

  • Size:  500 LF
  • Type: Renovation/Repairs
  • Delivery Method: Design-Bid-Build